The scheduled annual maintenance of Unit 5 of the Kozloduy Nuclear Power Plant has been completed, the plant announced. The unit was reconnected to the national electricity grid at 9:53 AM following an inspection and a positive assessment by the Bulgarian Nuclear Regulatory Agency.
BTA recalls that Unit 5 of the Kozloduy NPP was shut down for scheduled annual maintenance and refueling with nuclear fuel on May 5. As part of Kozloduy NPP's programme to diversify nuclear fuel supplies, 43 fuel assemblies manufactured by Westinghouse were loaded into the reactor. This marks the beginning of a four-year process of Unit 5's phased transition to RWFA nuclear fuel.
Over the next 24 hours the weather in the country will be dynamic. After temporarily dispersing, after midnight the clouds will increase and the precipitation will pick up from the Northwest. During the day on Sunday the rain will continue, and..
The Sofia district court has left 45-year old Bulgarian former athlete Petar Dachev in custody. Dachev was detained on 2 April in the region of Petrohan pass for possession of 30 kgs. of cocaine, public service TV BNT reports. The cocaine, hidden..
Against the background of protests in different towns across the country against the “war on the roads”, the poor condition of roads, corruption in public procurement and flawed road repairs, Minister of Interior Daniel Mitov has ordered a..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until..
Drivers travelling today and in the coming days should prepare their vehicles for winter conditions , the Road Infrastructure Agency has urged. The..
The Ministry of the Interior has submitted 13,000 reports about poor road conditions in 2024 . This was revealed in an interview with Nova TV by Chief..
+359 2 9336 661