Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

The major repair of Danube Bridge 1 to begin in July

The photo is illustrative
Photo: Asya Pencheva

The planned two-year major repair of Danube Bridge 1 is expected to begin in July, announced the Ministry of Tourism. The initial intention was for the repairs to start in the autumn, after the summer tourist season, but due to the critical condition of the bridge and the crumbling pavement, which poses a real danger to those crossing it, urgent action had to be taken. 

According to estimates of the Ministry of Regional Development and Public Works, the repair of Danube Bridge 1 will not significantly hinder traffic, as it will be regulated by traffic lights, without stopping traffic. The time required for processing documents at the border crossing will also compensate for any delays. ''Traffic will limited to one lane while the other is being repaired. Work will be carried out without days off and with extended working hours", said Regional Development Minister Violeta Koritarova, adding that Danube Bridge 1 has not been repaired for 70 years.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

The Bulgarian Orthodox Church and BSP discuss introduction of religion in schools

In the Synodal Palace, Bulgarian Patriarch Daniil met with the parliamentary group of "BSP - United Left". The delegation of the socialists was led by Deputy Prime Minister and Chairman of BSP, Atanas Zafirov, the Synod of the..

published on 11/5/25 8:45 AM

The weather will remain largely unchanged, with showers occurring only in the eastern regions

On Wednesday, the lowest temperatures will range from 5°C to 10°C, around 7°C in Sofia. During the day, cloud cover will remain significant, with light rain in some areas, mainly in Southeastern Bulgaria and the mountain regions. There will be a light..

published on 11/4/25 6:45 PM

Chirpan Tunnel on the Plovdiv-Burgas railway line to be ready by the end of 2026

Prokopan is the only railway tunnel on the Plovdiv-Burgas line. This became clear during a visit by Deputy Minister of Transport Lyuben Nanov, who was on-site to see the progress in the modernization of the Orizovo-Mihaylovo railway section. The..

published on 11/4/25 6:34 PM