The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian media. The works will be carried out every day for 10-12 hours, during daylight hours. Vehicles will travel in both directions on the lane that is not currently being repaired.
The estimated duration of the repairs is approximately 4.5 months per lane. An adaptive traffic light system will manage the traffic.
The total length of the Bridge of Friendship is 2,223 m. On the Bulgarian side, the Danube Bridge spans 1,057 m. No major repairs have been carried out since it was opened 70 years ago. The technical project for the repair of the facility provides for a complete replacement of the asphalt layers, panels, waterproofing, new road safety systems, markings, etc.
The Romanian authorities have been informed of the forthcoming rehabilitation through a series of meetings and letters.
On Friday, the lowest temperatures will be between 4°C and 9°C, reaching up to 12°C in the southeast, around 6°C in Sofia . During the next 24 hours, the weather will remain cloudy. It will rain in almost the entire country. During the day, rainfall..
The Varna District Court has released the city’s mayor, Blagomir Kotsev, on a financial bond of €102,258. Before the court’s decision was announced, supporters of the mayor and members of the We Continue the Change party gathered outside the..
Three people, including an Italian citizen, were arrested during last night's protest against the adoption of the 2026 budget in front of the National Assembly, the director of the Sofia Directorate of Internal Affairs, Chief Commissioner Lyubomir..
+359 2 9336 661