Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria is marking 90th anniversary of the consecration of the Freedom Monument on Mount Shipka

Photo: BTA

On this day, 90 years ago, the dedication of the Freedom Monument on Mount Shipka took place. It was erected in memory of the fallen heroes of the defended place during the Battle of Shipka, around which the decisive battles for the Russo-Turkish War and the Liberation of Bulgaria took place in the summer of 1877.

The monument was built with the voluntary sacrifices of the entire Bulgarian people. It was inaugurated on August 26, 1934, when it was consecrated by Metropolitan Pavel of Stara Zagora and welcomed with 101 cannon shots. Tsar Boris III cut the ribbon and delivered the first speech, followed by Prime Minister Kimon Georgiev.

The monument resembles a medieval Bulgarian fortress. It is 31.5 m high and 890 steps lead to it. A bronze lion stands proudly above the central entrance - a symbol of Bulgarian statehood. On the other three sides are written the names of Shipka, Sheynovo and Stara Zagora - the battlefields reminding of the feat of the Bulgarian militiamen.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM