Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Bulgaria signs engineering contract for new nuclear capacity with Westinghouse and Hyundai 

Photo: BTA

An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium. Within a year, the engineering design, worth between $350 million and $370 million, will determine the cost of building the new Kozloduy Unit 7. 

According to the caretaker government's plans, part of the construction of the new unit will be covered by proceeds from the future sale of equipment from the cancelled Belene NPP project to Ukraine. Caretaker Energy Minister Vladimir Malinov stressed that it was becoming increasingly realistic that Bulgaria would be the first in Europe to have nuclear units based on Westinghouse's AP1000 technology. 

At the signing ceremony, caretaker Prime Minister Dimitar Glavchev said that the new capacity project "will contribute to the diversification and stability of nuclear energy in Bulgaria and the whole of Southeast Europe".   



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Lokorsko, 17 February 2023

Traffickers go to court over deaths of 18 migrants in truck

The Sofia City Prosecutor's Office has brought five members of an organized crime group to court over murder of 18 Afghan citizens, the institution reported.  The case dates back to February 17, 2023, when the migrants were found..

published on 4/1/25 2:13 PM
Nikolay Kostov

More than 380 medicines are missing in the Bulgarian pharmacy network

There is currently a significant shortage of many medications in the country. Association of Pharmacy Owners Chair Nikolay Kostov pointed out that over 380 medications are missing from pharmacies. According to him, two electronic systems are..

published on 4/1/25 11:29 AM

There is no danger to the ecosystem after the oil spill near Varna

The sea waves have pushed the oil ashore, which was released by a ship in the waters near Varna on the morning of March 31. The pollution was localized between two jetties, and the oil has been successfully collected. In an interview with BNT,..

published on 4/1/25 11:12 AM