The government has requested an urgent meeting with European Commission representatives to discuss the cancelled tender for the acquisition of 35 multiple unit trains under the recovery and resilience plan. Minister of Transport Grozdan Karadjov explained, at a sitting of the parliamentary transport committee, that it is still possible to extend the procedure.
At the end of 2024, the Supreme Administrative Court annulled a decision by the Commission on Protection of Competition, and terminated the procedure for designating a contractor for the delivery of the new trains. Under the cancelled tender, the state railways were supposed to receive 35 trains for EUR 330 million and financing under the recovery and resilience plan. Minister Karadjov explained that he requested a top level meeting with the European Commission, adding that he believes there are no less than three different options for saving the tender.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661