Border Police remind that major repairs are underway on the Bulgarian section of the Danube Bridge in Ruse, and because of this, a temporary traffic organization has been implemented. Traffic is in one lane with a regulated flow, controlled by the contractor’s personnel. Traffic is normal at all other border checkpoints.
A complete reconstruction of the Stanke Lisichkovo border crossing is carried out. Due to the repair works, passage through the checkpoint is limited to a reduced number of lanes. Traffic remains normal at the other border crossings with North Macedonia.
Traffic at the border with Turkiye is normal at all border checkpoints.
Traffic at the border with Serbia is also normal at all border crossing points.
''Due to the increased interest in traveling on the Rudozem - Xanthi destination, we inform citizens that construction activities are underway on the road on the Greek side. The Greek authorities have placed signs indicating that the terrain is a construction site and that outsiders are not allowed to enter the site'', said the Bulgarian Border Police.
Only cars and vans up to 3.5 tons are allowed to pass through the border crossings in the areas of BCP's Makaza, Zlatograd and Ivaylovgrad.
Bulgaria’s Anti-Corruption Commission is investigating a large-scale property fraud and money laundering scheme connected to the 'Historical Park', which is associated with Ivelin Mihaylov, the leader of the Velichie party. Those arrested include the..
The ruling party and the opposition argued about the procedure for the Budget Committee meeting before the final vote on the 2006 budget . Assen Vassilev, chairman of the We Continue the Change party, attempted to block the committee’s extraordinary..
Employees in the agriculture and forestry sector staged a protest in front of the Parliament, demanding higher salaries for workers in departments that are secondary budget administrators. The protest was organized by the National Federation of..
+359 2 9336 661