The money necessary for the construction of the gas interconnection between Bulgaria and Greece are estimated at EUR 220 million, Bulgaria’s Minister of Energy Temenuzhka Petkova announced. The Energy Ministry aims at fulfilling the gas interconnection project within the frameworks of the planned road map, Minister Petkova added. The contractor under that project would be chosen in full transparence and with conformity with the Public Procurement Act, Temenuzhka Petkova further pointed out. According to initial plans, the interconnector should start functioning by mid 2018.
Since the beginning of the year, Bulgaria has also met the price stability criterion for eurozone membership, Minister of Finance Temenuzhka Petkova said. At the opening of the Investor Day 2025: Embracing Opportunities forum in..
A month after Bulgaria receives the green light to join the eurozone, all traders are obliged to have their prices in both Bulgarian levs and euro. This was what Deputy Minister of Economy Nikolay Pavlov said in an interview with the..
The main threats to Bulgaria's national security are Russia and the instability of the Western Balkans, according to the annual report of the State Agency for National Security (SANS) for 2024. In Bulgaria, two Russian..
Bulgaria’s President Rumen Radev discussed ways to boost trade and investment between Bulgaria and Poland during a meeting with representatives of..
In an open letter to Prime Minister Rosen Zhelyazkov and the Ministers of Agriculture, Finance and Economy, the Bulgarian Farmers' Union calls for new..
The second F-16 fighter jet is expected to arrive in Bulgaria within days, said Defense Minister Atanas Zapryanov during a lecture to students at the..
+359 2 9336 661