The whole equipment of the two nuclear reactors for the suspended Belene NPP will be delivered to Belene by the end of 2017, Bulgaria’s Minister of Energy Temenuzhka Petkova said on Wednesday. On Tuesday Minister Petkova met with representatives of Russia’s company Rosatom which manufactures the equipment. Bulgaria and Rosatom are holding talks aimed at signing an agreement for preservation of the nuclear equipment, Minister Petkova pointed out and added that according to the report of the Bulgarian Academy of Sciences about the necessity of construction of Belene nuclear power plant, Bulgaria and the region will need new nuclear facilities in 2035.
At the invitation of his German counterpart Annalena Berbock, minister Ivan Kondov participated in the meeting of foreign ministers of the countries of the Berlin Process. At the forum in Berlin, Kondov pointed out the importance of..
Bulgarian Jew David Levi, who survived Iran's missile attack against Israel in a bomb shelter, has told BNR that the situation in the country has calmed down with the opening of the airspace. This is a sign that the attack has passed,..
Bulgaria continues to be dedicated to the joint mission of developing the potential of science in support of peace in a world of fierce competition and for the positive development of our societies. This was what Bulgarian President..
Some of the Bulgarians in Lebanon were evacuated on a government aircraft flight on Monday evening. The first group, consisting of 89 people, mostly..
''The second evacuation flight from Lebanon will be carried out today around noon, provided the circumstances are favorable'', caretaker Premier Dimitar..
The Kalotina border checkpoint on the border with Serbia has already been renovated and has a nearly 30% increased capacity for passenger cars. It has..
+359 2 9336 661