The Bulgarian Nuclear Regulatory Agency issued a new ten year license for exploitation to the 5th unit of Kozloduy nuclear power plant. This is the maximum term allowed by the law, although conclusions made after the end of the programme aimed at expanding the lifespan of the nuclear reactor show that it can function safely until 2047. After the expiration of the ten-year license Kozloduy has to apply again for a new license. Thus, for the first time a Bulgarian nuclear facility will be able to produce electricity after the end of its project resource.
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until 2 May. Agreement on this was reached in Baku, Azerbaijan, by Bulgaria’s Minister of Energy Zhecho..
A wave of outrage is sweeping over Bulgaria after a severe accident on the Telish-Radomirtsi road (Pleven region), in which 12-year old Siyana lost her life as she was returning from a holiday with her grandparents. A protest is scheduled for today..
Bulgaria’s Minister of Foreign Affairs Georg Georgiev took part in the NATO foreign ministers meeting in Brussels on 4 April, 2025. Within the frameworks of the forum, Minister Georgiev met with his Ukrainian counterpart Andrii Sybiha; the two..
Drivers travelling today and in the coming days should prepare their vehicles for winter conditions , the Road Infrastructure Agency has urged. The..
The Ministry of the Interior has submitted 13,000 reports about poor road conditions in 2024 . This was revealed in an interview with Nova TV by Chief..
The large-scale inspection, carried out by the competent police structures of the National Police Directorate and the regional directorates of the..
+359 2 9336 661