Representatives of the Chinese National Energy Administration (NEA) have visited the construction site of the Belene NPP to get acquainted with the equipment already supplied under the project for a second nuclear power plant in Bulgaria.
The guests were welcomed by the Executive Director of the Bulgarian NEK, Petar Iliev, who showed them the measures taken for storing the Russian equipment supplied. The construction site of the power plant is 2500 decares. Necessary roads, a train line, a port and a concrete batching plant were built. The reactor unit and the turbine hall remain to be built, the Ministry of Energy added.
The Bulgarian National Radio (BNR) is successfully integrating artificial intelligence into its programmes. The public radio’s news is now read by an AI avatar trained in Bulgarian, operating in a virtual environment. One year after the public..
A delegation comprising MPs from Vazrazhdane party arrived in Moscow on Sunday. The delegation is led by Tsoncho Ganev, Deputy Chairman of Vazrazhdane and Deputy Chairman of the Bulgarian National Assembly, Georgi Georgiev, Deputy Chairman of..
The second F-16 fighter jet is expected to arrive in Bulgaria within days, said Defense Minister Atanas Zapryanov during a lecture to students at the University of Library Studies and Information Technologies. PM Rosen Zhelyazkov: The first..
Bulgaria’s President Rumen Radev discussed ways to boost trade and investment between Bulgaria and Poland during a meeting with representatives of..
A month after Bulgaria receives the green light to join the eurozone, all traders are obliged to have their prices in both Bulgarian..
Since the beginning of the year, Bulgaria has also met the price stability criterion for eurozone membership, Minister of Finance..
+359 2 9336 661