Representatives of the Chinese National Energy Administration (NEA) have visited the construction site of the Belene NPP to get acquainted with the equipment already supplied under the project for a second nuclear power plant in Bulgaria.
The guests were welcomed by the Executive Director of the Bulgarian NEK, Petar Iliev, who showed them the measures taken for storing the Russian equipment supplied. The construction site of the power plant is 2500 decares. Necessary roads, a train line, a port and a concrete batching plant were built. The reactor unit and the turbine hall remain to be built, the Ministry of Energy added.
The National Assembly has introduced a new requirement for state-owned enterprises to implement corruption risk management systems, which will also include appointing an integrity officer. The measure is recommended by the Organisation for Economic..
GERB leader Boyko Borissov said that he did not like budget 2026 and it would be frozen. Speaking to the media in parliament, Borissov said that the Joint Governance Council of the formations in the government, the Prime Minister..
North Macedonian Prime Minister Hristijan Mickoski accused attacked Macedonian Bulgarian journalist Vladimir Perev of staging the attack and self-harm, BGNES has reported. On November 21, in a shop in the center of Skopje, Perev..
+359 2 9336 661