After completion of work on the modernization of Unit 5 of the Kozloduy NPP for upgrading power performance up to 104 percent, carried out during the scheduled annual maintenance for this year, final testing is set for 13 and 14 July 2019.
The aim is to confirm readiness of the systems and equipment for performance in the conditions of upgraded power capacity in different modes of operation. A similar test programme was applied to Unit 6 of Kozloduy NPP in 2017. It now functions at full capacity - 1040 MWe.
The path to the economic prosperity of the Roma people goes through cultural legitimacy, says Ognyan Isaev, director of the Educational Opportunities and Achievements Program at the Trust for Social Alternative, on the occasion of International Romani..
Four of the people injured in the fire that broke out at a nightclub in the Macedonian city of Kočani will be discharged today from the Pirogov Emergency Hospital, announced Prof. Maya Argirova, head of the hospital’s Department of Burns and Plastic..
The Ministry of Justice has published for public discussion a package of legislative changes against delay in serious road accident cases. These measures are the result of a commitment made by Minister of Justice Georgi Georgiev to parents..
Drivers travelling today and in the coming days should prepare their vehicles for winter conditions , the Road Infrastructure Agency has urged. The..
The large-scale inspection, carried out by the competent police structures of the National Police Directorate and the regional directorates of the..
On Monday there will be snow showers or a mix of rain and snow in many places. The precipitation will decrease and stop, and the clouds will clear in the..
+359 2 9336 661