Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

First 500 meters of the longest tunnel in Bulgaria have been excavated

Photo: BGNES

The first 500 meters of the longest tunnel in Bulgaria have been excavated. It became clear during the inspection of Minister of Regional Development and Public Works Petya Avramova at Zheleznitsa Tunnel on Struma motorway. The future road infrastructure facility will consist of two separate two kilometer-long tubes for movement in each direction. The project is financed with EU money. Struma Motorway will connect Bulgaria’s capital Sofia and the Bulgaria-Greece border.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

There will be fog in the lowlands.

Friday will be overcast with showers

Friday will be mostly cloudy. Fog will cover the lowlands before midday. It will rain in some places, especially in southern Bulgaria. Minimum temperatures will be between 0 and 5°C, 2°C in Sofia, and maximum between 6 and 11°C, up to 17°C in the..

published on 2/27/25 7:55 PM

Bulgarians want more order and discipline in schools, survey shows

A serious restrictive and even repressive attitude among Bulgarian society on the current issues of school education and upbringing is shown by an independent poll by the sociological agency "Myara". It was conducted between January 29 and 31, 2025..

published on 2/27/25 7:20 PM

Bulgaria has the highest share of low-wage earners in the EU

In 2022, 14.7% of workers in the EU were low-wage earners . By definition, low-wage earners are those who earn two-thirds or less of the average gross hourly wage in the country.  Bulgaria had the highest share of low-wage earners (26.84%). This..

published on 2/27/25 4:57 PM