Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

First 500 meters of the longest tunnel in Bulgaria have been excavated

Photo: BGNES

The first 500 meters of the longest tunnel in Bulgaria have been excavated. It became clear during the inspection of Minister of Regional Development and Public Works Petya Avramova at Zheleznitsa Tunnel on Struma motorway. The future road infrastructure facility will consist of two separate two kilometer-long tubes for movement in each direction. The project is financed with EU money. Struma Motorway will connect Bulgaria’s capital Sofia and the Bulgaria-Greece border.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Warning of hazardous precipitation across Bulgaria

On Saturday, the lowest temperatures will be between 14 and 19°C; in Sofia - about 16°C. In the western regions, the highest temperature will be 19-20°C, while in the eastern regions of the country the temperature will reach up to..

published on 10/4/24 6:55 PM

EU's court lifts requirement for trucks to return to operational centre every two months

The Court of Justice of the EU has overturned part of European legislation requiring trucks for international transport to return every two months to the carrier's base. With its decision, the institution confirmed all other..

published on 10/4/24 4:31 PM
Dimitar Glavchev

Dimitar Glavchev: There is potential danger of a migrant wave

There is a potential danger of a wave of migrants, caretaker Prime Minister Dimitar Glavchev said at a briefing after the meeting of the Consultative Council on National Security , at which the risks to this country stemming from the..

published on 10/4/24 3:09 PM