Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Greece requires negative PCR test for arrivals from Bulgaria by plane

Photo: BGNES-archive

The restrictive measure will take effect on July 28, when the Greek border authorities will start requiring negative PCR test for Covid-19 performed up to 72 hours prior to entering this country, the Bulgarian Ministry of Foreign Affairs announces. The certificate must be translated in English and must contain first, middle and surname of the passenger, as well as number of passport or ID card. The tests will be recognized if they are performed at private or national laboratories accredited by the state authorities. On July 28 and 29 travellers who have not managed to undergo Covid-19 tests will be tested by the Greek border authorities upon their arrival in Greece. The requirement for passenger locator form (PLF) generating a QR code at least 24 hours prior to arrival remains in place. No changes in the requirements for crossing the land borders between the two countries have been made.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Elena Yoncheva

Delyan Peevski wants Elena Yoncheva to receive mandate for negotiations with the Houthis in Yemen

The leader of "DPS-New Beginning" Delyan Peevski has called on the caretaker government and all responsible institutions, including the parliament, to give MEP Elena Yoncheva a mandate to negotiate for the release of the captured..

published on 11/4/24 9:29 AM

Bulgarian Vice President opens exhibition dedicated to ancient Thrace in Getty Museum

God has gifted people with an incredible quality - to dream. And we dreamt of hearing Bulgarian in the Getty Museum during the opening of an incredible exhibition. An exhibition dedicated to an ancient people, an exhibition that..

published on 11/4/24 8:47 AM

Kozloduy NPP signs engineering contract for new nuclear facilities with Hyundai and Westinghouse

An engineering contract for the construction of new nuclear facilities at Site No. 2 of the Kozloduy NPP will be signed today with Hyundai and Westinghouse. According to caretaker Minister of Energy Vladimir Malinov, the..

published on 11/4/24 8:30 AM