An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
Another evacuation flight from Lebanon to Bulgaria would be risky and almost impossible to organise , said Bulgaria's ambassador in Beirut, Iassen Tomov. Alternative options are being considered to bring the Bulgarian citizens home. On Tuesday, 169..
Most Bulgarians (60%) are optimistic about the future of the EU. The EU-wide figure is 65%, according to a Eurobarometer post-election survey published by the European Parliament. Positive attitudes towards the Community are also high - more..
Daily Mail Online published a letter from former teacher Simon Hill under the title “I’m living the Bulgarian retirement dream”. The retiree and his wife own two properties in Bulgaria. They get better healthcare, enjoy hot summers and ski in the..
Caretaker Minister of Foreign Affairs Ivan Kondov is leading the Bulgarian delegation at the 45th session of the Ministerial Conference of La..
Due to the official recommendation of the European Commission and the European Union Aviation Safety Agency (EASA), Bulgaria Air has canceled all..
On Friday, lows will be between 10 and 15 degrees Celsius , 13°C in Sofia. Maximum temperatures will be between 26 and 31°C, 28° in the capital. During..
+359 2 9336 661