After 01.00 on January 22, Unit 5 of Kozloduy NPP was disconnected from the country's energy system. The reason is the activation of protection system during routine operations. There is no deviation from the normal radiation situation, the nuclear power plant reported. There is no leakage of radiation and reason for concerns, the chairman of the Bulgarian Nuclear Regulatory Agency Tsanko Bachiyski has told BNR's Horizont program.
He expects the unit to start operating by the end of the day. Load of hydroelectric and thermal power plants has been increased to compensate for the electricity of the unit. There is no need to import electricity, as currently domestic consumption is not high, the electricity system operator added.
“I call on all representatives of the Movement for Rights and Freedoms in local government — mayors and municipal councilors — to ensure security and predictability for the people and to take the necessary steps to keep all local taxes and fees..
Bulgaria has climbed to 11th place in this year’s Digital Quality of Life 2025 (DQL) index published by Surfshark, up from 18th last year, BTA reported. The index evaluates countries’ digital well-being across five dimensions: fixed broadband..
Around 90% of the antiques seized during an international operation targeting a cultural property trafficking network will be returned to Bulgaria, Deputy Minister of Culture Todor Chobanov told “Nova TV”. “This is an unprecedented operation in..
+359 2 9336 661