After 01.00 on January 22, Unit 5 of Kozloduy NPP was disconnected from the country's energy system. The reason is the activation of protection system during routine operations. There is no deviation from the normal radiation situation, the nuclear power plant reported. There is no leakage of radiation and reason for concerns, the chairman of the Bulgarian Nuclear Regulatory Agency Tsanko Bachiyski has told BNR's Horizont program.
He expects the unit to start operating by the end of the day. Load of hydroelectric and thermal power plants has been increased to compensate for the electricity of the unit. There is no need to import electricity, as currently domestic consumption is not high, the electricity system operator added.
Bulgaria’s Anti-Corruption Commission is investigating a large-scale property fraud and money laundering scheme connected to the 'Historical Park', which is associated with Ivelin Mihaylov, the leader of the Velichie party. Those arrested include the..
The ruling party and the opposition argued about the procedure for the Budget Committee meeting before the final vote on the 2006 budget . Assen Vassilev, chairman of the We Continue the Change party, attempted to block the committee’s extraordinary..
Employees in the agriculture and forestry sector staged a protest in front of the Parliament, demanding higher salaries for workers in departments that are secondary budget administrators. The protest was organized by the National Federation of..
+359 2 9336 661