Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Caretaker cabinet dismisses the head of Bulgaria’s Road Infrastructure Agency

Ivan Dosev
Photo: BGNES

Engineer Ivan Dosev was removed from the Management Board of the Road Infrastructure Agency. In an interview for the BNRIvan Dosev confirmed that he was no longer part of the agency’s management, but did not comment the information that the other board members Professor Oleg Assenov and Georgi Terziyski were also removed from their posts.

"I was removed from the post at the discretion of the minister", answered engineer Dosev. Georgi Terziyski thanked his colleagues on Fecabook: "The difficult and unknown road is the challenge that makes you overcome impasse. I would like to thank the people who walked with me on the path of creation. Time will tell who the builders and the destroyers are. We were a great team!" wrote Georgi Terziyski.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria joins European network for cancer care

Bulgaria is joining a European consortium of national cancer centres. Speaking to BNR, Assoc. Prof. Dr. Assia Konsoulova stressed that this is the fruit of many years of effort, "because the Bulgarian patient deserves to be treated in both a cancer centre..

published on 7/8/24 5:58 PM

Code Yellow alert for hot weather issued for all Bulgarian districts on Tuesday

It will be sunny and hot on Tuesday. There will be light to moderate northerly wind. The lowest temperatures will range from 17°C to 22°C, for Sofia 17°C. Maximum temperatures will range from 34°C to 39°C, for Sofia - around 33°C. It will be..

published on 7/8/24 5:20 PM
Reactor No. 6 of the Kozloduy NPP

Kozloduy NPP’s reactor No. 6 reconnected to electricity system

Reactor No. 6 of the Kozloduy Nuclear Power Plant was reconnected to the national electricity system at 9 AM on 8 July. The reactor was disconnected on 15 June for planned preventive maintenance of the functioning of a non-nuclear transformer and a..

published on 7/8/24 11:21 AM