There are two dates set down in the recovery and resilience plan, adopted by the government, for the closure of the coal-fired power stations – 2038 or in 2040, caretaker Prime Minister Stefan Yanev announced.
“The mechanism of fixing these dates is yet to be finalized on the basis of technical analysis. If the date can be after 2040 – then so be it. But let’s not juggle dates around and scare people. Quite the opposite, what we want is predictability,” PM Yanev said.
“A great deal of work has gone into the document over the past 5 months. The plan was discussed with the 46th National Assembly and with the affected organizations from the industry,” Stefan Yanev added.
The plan is to be submitted to the European Commission for discussion and negotiation on 15 October.
“Borders cannot be changed by force, and Ukraine’s long-term security must be guaranteed”, Bulgaria’s Premier Rossen Zhelyazkov said during a videoconference meeting of the “Coalition of the Willing”, led by French President Emmanuel Macron and UK..
Business forum on the topic "Bulgaria - China: cooperation in the automotive sector" is being held on November 26 in Sofia. Its organizers are the Bulgarian Chamber of Commerce and Industry and the Embassy of the People's Republic of..
The Bulgarian Industrial Capital Association has called for participation in a protest on November 26 against the budget for 2026, which is about to be adopted at second reading. "We call not only our members, but also all..
+359 2 9336 661