The planned annual repairs of Unit VI of Kozloduy NPP have been completed five days ahead of schedule. On November 1, at 1.41 am, it joined the country's energy system after an inspection and approval by the Nuclear Regulatory Agency.
The unit was stopped on September 29. For 31 days, the capacity of 1,000 megawatts was not part of the electricity market, which caused further rise of energy prices in Bulgaria.
Equipment maintenance has been performed and the unit has been refueled with fresh nuclear fuel. All the planned activities related to increasing the safety and ensuring the long-term operation of the unit have been carried out. The 5th nuclear power unit of Kozloduy is also operating at full capacity, the power plant's head Nasko Mihov said.
On Wednesday morning, visibility will be reduced in some places in the valleys, plains and along the Black Sea coast. Minimum temperatures will range between minus 3 and 2°C, around minus 2°C in Sofia. During the day it will be sunny with highs between..
For the first time in recent election history, the end election result leaves a party running in the election outside the National Assembly with a result of 3.999% (Velichie), 21 votes short of the electoral threshold, reads a position by the..
The Central Election Commission (CEC) is sending the prosecutor the video recordings of the ballot count in 7 polling stations where there is a discrepancy in the number of votes counted. The prosecutors will have to check whether there is..
2.5% is the necessary effort that our country must make in terms of defence spending, caretaker Minister of Defense Atanas Zapryanov..
The Bulgarian Ministry of Defense has signed a contract with Polish state company Wojskowe Zakłady Lotnicze Nr 2 S.A. for major repair of six MiG-29..
The chief of police in Petrich and two other police officers, arrested two days ago, are accused of participating in a criminal group. This was..
+359 2 9336 661