The interconnector with Greece near Komotini is expected to be completed by the end of June and the Azeri gas to flow through it to Bulgaria in September, Prime Minister Kiril Petkov, who inspected the gas route today, said.
According to PM Petkov, Bulgaria has three alternative sources of gas if supplies from Russia are cut off. "This facility can bring 3 bcm, which is Bulgaria's approximate consumption. There are also gas connections through Mesemviria and Turkey, so we are absolutely ready for such a scenario," he said.
Kiril Petkov reminded that the purpose of the interconnector between Bulgaria and Greece was to link the gas transmission networks of the two countries and provide access to the Southern Gas Corridor and a number of new sources of natural gas.
The government has approved a procedure that will open the country’s passenger rail transport to private operators, including foreign ones. This is set to begin on December 13, 2026. The planned duration of the contracts is 12 years. The country..
The Bulgarian Council of Ministers has authorized the entry and stay of the Turkish research vessel R/V TUBITAK MARMARA in Bulgarian maritime spaces from 5 to 20 September 2025. The vessel will participate in an international scientific..
Even in the unclear context of the Russian war in Ukraine, Bulgarians continue to perceive European countries as the closest among international factors. These are the results of a new survey by the sociological agency "Myara", conducted with its own..
"There is no control body and it is not clear who checks the sports attractions, as well as who is responsible for their use". This was..
More and more young people in Bulgaria are succumbing to the easy access to quick loans, driven by the lack of financial experience, the desire for..
The Food Safety Agency of Azerbaijan has imposed temporary restrictions on the import of certain goods from some regions of Bulgaria and Croatia due to..
+359 2 9336 661