The Interconnector Greece-Bulgaria (IGB) has been hooked up to the Trans-Adriatic gas pipeline (TAP). The tie-in was completed with two golden welds, connecting a gas metering station at Komotini with TAP's existing infrastructure.
The successful connection of the infrastructure of the two energy projects is key to the completion of the next stage and to the commercial launch of the IGB which was planned for later this year. This was announced by the joint investment company which is building the interconnector.
IGB connects Bulgaria to the Trans-Adriatic gas pipeline which allows natural gas to be transported from Azerbaijan via Greece to Italy and the South-East European region.
Nineteen people have been detained last night for drug possession during a special police operation on the territory of Sofia, the Interior Ministry has announced. Cannabis, ecstasy and more than 400 canisters of laughing gas, as well as..
An Archangel All Souls' Day memorial service was conducted by Patriarch Daniil at the military ossuary museum at the central Sofia cemetery. In his message he stated that today we honour the memory of all of our soldiers: “They are an example..
Almost half of the unemployed under the age of 29 in this country have secondary school education, indicate the latest data of the National Employment Agency. There are 17.350 people from this age bracket registered at the job centres –7,570 of..
Today, 3 November, is International Day for Biosphere Reserves, declared by UNESCO’s Man and the Biosphere programme. On this occasion, as of the second..
Today, Vice President Iliana Iotova is opening the exhibition “Ancient Thrace and the Classical World: Treasures from Bulgaria, Romania, and Greece” at..
In the elections on October 27 this year there were problems in both phases of the process - when the votes were submitted and when they..
+359 2 9336 661