Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Unit 6 of Kozloduy NPP put back into operation

Photo: Radio Vidin

The sixth unit of the Kozloduy NPP has been reconnected to the country's energy system, the nuclear power plant reported.

During tests after scheduled maintenance work, the reactor was stopped on October 29 as a technical problem was found in the cooling system of the generator in the non-nuclear part of the unit. After eliminating the reasons that led to the shutdown, the teams of the nuclear power plant carried out the necessary tests according to the requirements for safe operation. The checks carried out confirm that all systems are working normally, experts announced




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Sofia Mayor Vassil Terziev

Sofia municipality plan envisages modern tourism conditions and year-round access to Mount Vitosha

A Sofia municipality plan for the development of Mount Vitosha envisages improving transport connectivity and year-round access to the mountain. The most important thing is for Vitosha to be integrated into the city, Sofia mayor Vassil Terziev..

published on 4/3/25 10:46 AM
The oil slick before it was cleaned up

Oil slick on Varna beach cleaned up

The oil slick between waterbreakers 2 and 2 on the beach in Varna has been cleaned up, there is no oil in the sea water either, indicate the results of an inspection by the commission appointed by order of the regional governor. However, small oil..

published on 4/3/25 9:44 AM

Salaries at psychiatric hospitals to go up by 50%

The parliamentary Committee on Health has decided to raise the pay of the people employed at state-run psychiatric hospitals by 50% as of 1 May this year. The MPs tasked two cabinet ministers - of health and of finance – to take the necessary steps,..

published on 4/3/25 9:02 AM