Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.
The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule.
President Rumen Radev will participate in the tenth edition of the Delphi Economic Forum in Greece on April 9 and 10. The event brings together heads of state and government, representatives of the business and non-governmental..
The personnel crisis in the tourism sector has reached critical levels, with various data indicating that up to 70% of tourist sites are understaffed. Economic losses from unrealized tourism potential are estimated at nearly 500..
On Wednesday, the wind from the northwest will get stronger. Cloudiness will be variable, more significant in the afternoon. The lowest temperatures will be between minus 5°C and 0°; in Sofia - around minus 3°C and the highest will..
The path to the economic prosperity of the Roma people goes through cultural legitimacy, says Ognyan Isaev, director of the Educational Opportunities..
The Ministry of Justice has published for public discussion a package of legislative changes against delay in serious road accident cases. These..
House prices in the EU rose by 4.9% in the fourth quarter of 2024 compared with the same period in 2023, according to data from the European statistics..
+359 2 9336 661