Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.
The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule.
Four of the people injured in the fire that broke out at a nightclub in the Macedonian city of Kočani will be discharged today from the Pirogov Emergency Hospital, announced Prof. Maya Argirova, head of the hospital’s Department of Burns and Plastic..
The Ministry of Justice has published for public discussion a package of legislative changes against delay in serious road accident cases. These measures are the result of a commitment made by Minister of Justice Georgi Georgiev to parents..
For the first time, Bulgaria is presenting a national pavillion at the prestigious furniture and interior design exhibition Salone del Mobile 2025 , which takes place from 8 to 13 April in Milan, Italy. Eight Bulgarian companies will..
The path to the economic prosperity of the Roma people goes through cultural legitimacy, says Ognyan Isaev, director of the Educational Opportunities..
The Ministry of Justice has published for public discussion a package of legislative changes against delay in serious road accident cases. These..
The football match should not be a battlefield, but a place where you can take your child – this motive united the organizers of the..
+359 2 9336 661