"Ukraine is still keen to buy the equipment for Bulgaria's second nuclear power plant - Belene - and is ready to pay the price we are asking," Energy Minister Rumen Radev said during an inspection of the construction of Bulgaria's gas link with Serbia.
In his words, the price will be higher than the 1.2 billion leva (about 600 million euro) set by the National Assembly. The funds received will be used for the construction of units 7 and 8 of the Kozloduy NPP with Westinghouse AP 1000 technology. The construction of the two new units will be profitable for Bulgaria, Radev said, without specifying the price.
Initially, Sofia wanted to keep part of the equipment for the needs of the two operating units of Kozloduy NPP - 5 and 6, with Russian VVER reactors.
The National Assembly has introduced a new requirement for state-owned enterprises to implement corruption risk management systems, which will also include appointing an integrity officer. The measure is recommended by the Organisation for Economic..
GERB leader Boyko Borissov said that he did not like budget 2026 and it would be frozen. Speaking to the media in parliament, Borissov said that the Joint Governance Council of the formations in the government, the Prime Minister..
North Macedonian Prime Minister Hristijan Mickoski accused attacked Macedonian Bulgarian journalist Vladimir Perev of staging the attack and self-harm, BGNES has reported. On November 21, in a shop in the center of Skopje, Perev..
+359 2 9336 661