"Ukraine is still keen to buy the equipment for Bulgaria's second nuclear power plant - Belene - and is ready to pay the price we are asking," Energy Minister Rumen Radev said during an inspection of the construction of Bulgaria's gas link with Serbia.
In his words, the price will be higher than the 1.2 billion leva (about 600 million euro) set by the National Assembly. The funds received will be used for the construction of units 7 and 8 of the Kozloduy NPP with Westinghouse AP 1000 technology. The construction of the two new units will be profitable for Bulgaria, Radev said, without specifying the price.
Initially, Sofia wanted to keep part of the equipment for the needs of the two operating units of Kozloduy NPP - 5 and 6, with Russian VVER reactors.
Due to the outbreak of Peste des Petits Ruminants (sheep and goat plague) in Velingrad and the subsequent protests by farmers, 300 new samples will be taken today. Currently, 1,700 sheep are at risk of being forcibly euthanized. The decision for a..
Exactly a month after the parliamentary elections on October 27, the first session of the 51st National Assembly, which started on November 11, continues today. MPs will make a sixth attempt to elect a speaker. During the fifth..
Wednesday will be mostly sunny. There will be weak to moderate west-northwesterly wind. The lowest temperatures are expected to be between minus 3° and 2°C; in Sofia - around minus 1°C. The highest temperature will reach 10°C to 15°C;..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
+359 2 9336 661