The Romanian National Company for Road Infrastructure Administration (CNAIR) has announced a tender for a feasibility study for the construction of a new bridge over the Danube River between Giurgiu in Romania and Ruse in Bulgaria, reports "Economedia". The maximum period for completing the study is 23 months from the contract's effective date.
The maximum cost of the feasibility study is estimated at 71.9 million Romanian lei (EUR14.46 million), which will be funded by EU grants provided through the Connecting Europe Facility (CEF). The documentation for awarding the contract for the feasibility study has been published in the Electronic System for Public Procurement. This will be the third bridge over the Danube between Romania and Bulgaria, "Economedia" recalls.
Italian investors have shown interest in the concession and development of Plovdiv Airport as a passenger and cargo terminal. This became clear during a meeting between Plovdiv District Governor Hristina Yancheva and the Ambassador of Italy to..
On the threshold of the active summer season, which in this country is no more than two months – July and August, the tourism industry is relatively calm. Bookings are good and forecasts for a growth of 6% compared to last year at the..
This year will be the last in which Bulgarians receive their income in leva. In what currency will people declare their money to the tax authorities next year? This is one of the 221 questions about the euro that the Bulgarian National Bank (BNB)..
+359 2 9336 661