The Romanian National Company for Road Infrastructure Administration (CNAIR) has announced a tender for a feasibility study for the construction of a new bridge over the Danube River between Giurgiu in Romania and Ruse in Bulgaria, reports "Economedia". The maximum period for completing the study is 23 months from the contract's effective date.
The maximum cost of the feasibility study is estimated at 71.9 million Romanian lei (EUR14.46 million), which will be funded by EU grants provided through the Connecting Europe Facility (CEF). The documentation for awarding the contract for the feasibility study has been published in the Electronic System for Public Procurement. This will be the third bridge over the Danube between Romania and Bulgaria, "Economedia" recalls.
The Bulgarian state-owed natural gas supplier Bulgargaz has proposed that the price of natural gas for November increases by around 8% to nearly 66 BGN per megawatt-hour, excluding fees and taxes, reported BNR's journalist Yuliana Kornazheva. The..
The growth of the national economy in the second quarter of 2025 accelerated by 3.5% on an annual basis. According to an analysis by the Bulgarian National Bank - BNB, the main factors for the acceleration are the decrease in imports..
For the first time, Bulgaria’s Minister of Finance Temenuzhka Petkova took part as an observer in the regular meeting of the Eurogroup held in Luxembourg, the Ministry of Finance said. Until now, Bulgaria has only participated in Eurogroup..
Citizens should remain calm about the introduction of the euro in Bulgaria from January 1, 2026, as the Bulgarian National Bank and commercial banks are..
Bulgaria’s Ministry of Finance has published the draft state budget in euros for 2026. The country’s GDP is projected to reach EUR 120.1 billion, with..
+359 2 9336 661