In the early hours of October 19, 2024, Unit 6 of the Kozloduy NPP will be shut down for planned annual maintenance that is expected to last until the end of November. During this time, the planned repair works and recharging of the reactor with fresh nuclear fuel will be carried out.
The fifth power unit of the Kozloduy NPP operates according to the electricity production schedule, it was reported.
Bulgaria has one nuclear power plant - Kozloduy NPP, which has two operating units - No. 5 and No. 6. Nuclear energy provides about 40% of the country's gross electricity production.
The U.S. Department of State today released the data for the refused type B visas for the financial year 2024. For Bulgaria, this percentage is 6.02%, which marks a significant decrease compared to last year, when it was 11.61%. This is the lowest..
The Bulgarian MPs gathered in plenary today for a sixth attempt to elect a President, which again proved unsuccessful. The chances of electing a Speaker of the 51st National Assembly are minimal The candidates Natalia Kiselova from..
Bulgaria's Ambassador to Egypt Deyan Katrachev met with Egypt's newly appointed Minister of Civil Aviation Sameh al-Hefny . At the meeting, which took place on 26 November, both discussed the updating of the air transport agreements between the two..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
+359 2 9336 661