In the early hours of October 19, 2024, Unit 6 of the Kozloduy NPP will be shut down for planned annual maintenance that is expected to last until the end of November. During this time, the planned repair works and recharging of the reactor with fresh nuclear fuel will be carried out.
The fifth power unit of the Kozloduy NPP operates according to the electricity production schedule, it was reported.
Bulgaria has one nuclear power plant - Kozloduy NPP, which has two operating units - No. 5 and No. 6. Nuclear energy provides about 40% of the country's gross electricity production.
'The dialogue between employers and trade unions has been restored. Consultations will begin tomorrow at the Ministry of Finance to iron out all the details. The state is committed to supporting every Bulgarian citizen.' This was written by GERB leader..
Bulgarian citizens traveled abroad 829,300 times in October, which is 15% more than in October 2024 , according to the National Statistical Institute. The most popular destinations were Turkey, Greece, Serbia, Romania, Germany, North Macedonia,..
The National Assembly has introduced a new requirement for state-owned enterprises to implement corruption risk management systems, which will also include appointing an integrity officer. The measure is recommended by the Organisation for Economic..
+359 2 9336 661