In the early hours of October 19, 2024, Unit 6 of the Kozloduy NPP will be shut down for planned annual maintenance that is expected to last until the end of November. During this time, the planned repair works and recharging of the reactor with fresh nuclear fuel will be carried out.
The fifth power unit of the Kozloduy NPP operates according to the electricity production schedule, it was reported.
Bulgaria has one nuclear power plant - Kozloduy NPP, which has two operating units - No. 5 and No. 6. Nuclear energy provides about 40% of the country's gross electricity production.
“I call on all representatives of the Movement for Rights and Freedoms in local government — mayors and municipal councilors — to ensure security and predictability for the people and to take the necessary steps to keep all local taxes and fees..
Bulgaria has climbed to 11th place in this year’s Digital Quality of Life 2025 (DQL) index published by Surfshark, up from 18th last year, BTA reported. The index evaluates countries’ digital well-being across five dimensions: fixed broadband..
Around 90% of the antiques seized during an international operation targeting a cultural property trafficking network will be returned to Bulgaria, Deputy Minister of Culture Todor Chobanov told “Nova TV”. “This is an unprecedented operation in..
+359 2 9336 661