Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

Photo: kznpp.org

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve safety, the reactor was refueled with fresh nuclear fuel. 

The unit's load will be gradually increased as required.

Unit 5 of the Kozloduy NPP is operating normally.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Temenuzhka Petkova

Finance Minister to present Bulgaria's euro area readiness in Brussels

Bulgarian Finance Minister Temenuzhka Petkova will travel to Brussels to provide an update on Bulgaria’s progress towards euro area accession. The Finance Ministry has confirmed that Minister Petkova will participate in the Eurogroup meeting on 17..

published on 2/17/25 7:40 AM

Snow, rain and freezing temperatures

Minimum temperatures on Monday will be between minus 4 and 1°C. In Sofia it will be around minus 3°C. The mercury will hover between -3 and 0 °C in the north. Maximum temperatures in southern Bulgaria will be between 2 and 7°C. In the capital it will..

published on 2/16/25 7:05 PM

New Russian emigration in Bulgaria pays tribute to Alexei Navalny

The one-year anniversary of the death of Russian opposition leader Alexei Navalny was marked with a memorial service in Sofia's St Nedelya Cathedral. It was organised by the movement "For a Free Russia" - an association of Russian immigrants in..

published on 2/16/25 5:39 PM