Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

Photo: kznpp.org

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve safety, the reactor was refueled with fresh nuclear fuel. 

The unit's load will be gradually increased as required.

Unit 5 of the Kozloduy NPP is operating normally.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Children's hospital to open in Burgas by the end of the year

A children's hospital for active treatment will open in Burgas by the end of the year, it became clear during the inspection of its construction by Prime Minister Rosen Zhelyazkov. The medical facility will have 16 wards with 147..

published on 4/24/25 2:50 PM

PP points out corruption as a distinctive feature of the government in its first 100 days

“We Continue the Change” (PP) highlighted corruption as one of the main shortcomings of the hundred days of government of GERB, “BSP – United Left” and ITN. PP has not cancelled plans of filing a vote of no confidence after Bulgaria..

published on 4/24/25 1:59 PM

BIA presents its economic policy effectiveness index

Bulgaria faces deep structural challenges. The economy is characterized by low added value and regional challenges, chairman of the Bulgarian Industrial Association (BIA), Dobri Mitrev, said. He presented the BIA index for “Economic..

published on 4/24/25 1:10 PM