Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Energo Pro: Almost all damages to the electrical facilities have been repaired

Photo: BTA

More than 98% of the identified damages to the electrical facilities have already been repaired, said Energo Pro. Emergency teams continue their efforts to restore electricity to dozens of villages in the regions of Gabrovo and Targovishte and Gorna Oryahovitsa municipality.

Most of the damages were repaired yesterday, but the snowy conditions continue to cause problems, as the wet snow is causing trees to fall onto power lines, leading to new damage to the electrical facilities, the company added.

Over 250 electricians are trying to reach the affected areas. Despite the provision of additional equipment, some of the damaged power lines are located in rough terrain and access to them is only possible on foot. Additionally, there are fallen concrete and steel lattice poles, the replacement of which requires more technological time.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Rosen Zhelyazkov

Premier Zhelyazkov: The defence capabilities of the European Union and NATO must be strengthened

''Sabotage groups are operational in Bulgaria, and they exert hybrid influence and are part of Bulgaria's political life'', Prime Minister Rosen Zhelyazkov said in Parliament in response to a question about whether there is data on hybrid attacks and..

published on 10/3/25 12:34 PM

Burgas Municipality declares a partial state of emergency due to heavy rainfall

The Municipality of Burgas has declared a partial state of emergency until October 6. Mayor Dimitar Nikolov said that evacuations will be carried out in the areas most affected by the heavy rainfall, if necessary.  The measure was introduced due to..

published on 10/3/25 11:11 AM
Tomislav Donchev

50% of all funds under the operational programs have been contracted, says Deputy Premier Tomislav Donchev

''Funds disbursed under all EU operational programs amount to 3.3 billion BGN (1.587 billion EUR). A total of 12 billion BGN (5.770 billion EUR) has been contracted, representing 50% of the total funding. Contracting has accelerated by 50%, and..

published on 10/3/25 10:51 AM