Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
The European Commission hopes to have a positive decision this year on at least part of the second payment under the Recovery and Resilience Plan in the amount of 653 million euros for Bulgaria . This was stated by the Commission spokesman Maciej..
There will be no recount of ballots from the recent parliamentary elections in October 2024. The Central Election Commission (CEC) met today after the Constitutional Court yesterday ordered a recount of the parliamentary election results due to numerous..
The effects of the protests against supermarkets are being felt, Agriculture Minister Georgi Tahov said in Plovdiv, where he was attending a national meeting of fruit and vegetable producers. He added that there had already been a drop in the price of..
On Wednesday, minimum temperatures will range between minus 5° C. and zero, lower in the Northeastern parts of the country where they will drop down..
Hristo Stoichkov has been appointed the Sports Tourism Ambassador for the World Tourism Organization (UN Tourism). This became clear at an official..
Increasing energy connectivity between countries in the region of Southeast Europe will reduce electricity prices, increase competitiveness and security..
+359 2 9336 661