Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
According to the Bulgarian Embassy in Berlin, there is currently no information about Bulgarian citizens injured after the terrorist attack in the city of Magdeburg , in which a car rammed into a crowd at the city's Christmas market. The Embassy is in..
At the last moment, when the third expedition of Bulgaria's Antarctic research ship was supposed to leave for Antarctica in November, we received a letter that the money for the ship to return back has been redirected to grain producers. This meant that..
The Bulgarian Foreign Ministry has expressed its heartfelt condolences over the terrible tragedy at the Prečko School in Zagreb. "Our thoughts are with the people of Croatia," the ministry wrote on the X network. A child died on December 20, and..
According to the Bulgarian Embassy in Berlin, there is currently no information about Bulgarian citizens injured after the terrorist attack in the city of..
Representatives of 4 clubs of the Macedonian Patriotic Organization (MPO) in North America met at the Church of the Holy Spirit in Youngstown. The host..
The Bulgarian Foreign Ministry has expressed its heartfelt condolences over the terrible tragedy at the Prečko School in Zagreb. "Our thoughts are with..
+359 2 9336 661