Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
The state will continue to function normally even without the parliament voting on the state budget , according to an analysis by the Institute for Market Economics (IME) called "Without a Budget for 2025 and Without an Extension Law: What Next?". The..
People from the Bulgarian Socialist Party headquarters at 20 Positano Street in Sofia were evacuated due to a bomb threat on Saturday morning. The threat was received by email, according to which a bomb had been placed in a building on Positano Street..
The spy network of Bulgarians led by Austrian Jan Marsalek in the UK had an agent in Austria , Austrian and German media reported, quoted by BGNES. The Vienna prosecutor's office is investigating a Bulgarian woman for espionage for the Russian..
According to the Bulgarian Embassy in Berlin, there is currently no information about Bulgarian citizens injured after the terrorist attack in the city of..
Representatives of 4 clubs of the Macedonian Patriotic Organization (MPO) in North America met at the Church of the Holy Spirit in Youngstown. The host..
The Bulgarian Foreign Ministry has expressed its heartfelt condolences over the terrible tragedy at the Prečko School in Zagreb. "Our thoughts are with..
+359 2 9336 661