Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
Increased traffic is expected on the country's roads during the weekend . During peak hours, 1,500 cars per hour will pass on the highways. A special traffic organization has been introduced on the Hemus highway. Traffic for heavy trucks through..
In the presence of diplomats, Bulgarian Foreign Minister Ivan Kondov unveiled in Plovdiv the latest mural from the ministry's competition "Bulgaria - More Beautiful in NATO". The event is dedicated to the 20th anniversary of the country's membership in..
On Saturday, a cold front will sweep across the country. During the night there will be rain in Western and Central Bulgaria, and snow in the mountains and on higher ground. A snow cover will form. Minimum temperatures 1-6° C., for Sofia around 1°..
According to the Bulgarian Embassy in Berlin, there is currently no information about Bulgarian citizens injured after the terrorist attack in the city of..
Representatives of 4 clubs of the Macedonian Patriotic Organization (MPO) in North America met at the Church of the Holy Spirit in Youngstown. The host..
The spy network of Bulgarians led by Austrian Jan Marsalek in the UK had an agent in Austria , Austrian and German media reported, quoted by BGNES...
+359 2 9336 661