The 5th unit of Kozloduy nuclear power plant has been going under a planned annual maintenance and modernization. The unit will be loaded with fresh nuclear fuel during the maintenance campaign. Some measures aimed at extending the life of the 1,000 megawatt reactor will be also fulfilled. Its thermal power is expected to increase with 4% after the annual maintenance. The maintenance of the 5th reactor at Kozloduy NPP will continue until mid June. Currently the 6th nuclear reactor is functioning at its full capacity.
Prime Minister Rosen Zhelyazkov presented the national flag to the Olympiad teams in natural sciences for 2025. At the ceremony in the building of the Council of Ministers, it was pointed out that in 2024, the Bulgarian teams in..
The bathing water in Primorsko is the cleanest in Bulgaria and second in Europe in terms of quality, according to a report by the European Environment Agency. The quality of sea water in Primorsko is close to the perfect score of 100% for ideal..
Bulgaria’s Deputy Premier and Minister of Transport and Communications Grozdan Karadzhov met with North Macedonia’s Deputy Prime Minister and Minister of Transport Aleksandar Nikoloski at the Global Transport Connectivity Forum 2025 in Istanbul , the..
A segment of a global money laundering network operating through financial fraud has been dismantled, the Sofia District Prosecutor's Office and the..
A concert of the legendary Duke Ellington Orchestra will take place on the square in front of the National Palace of Culture in the..
Sofia Municipality has requested the removal of a tent camp set up in front of the Presidency building during a protest organized by the "Vazrazhdane"..
+359 2 9336 661