Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

5th unit of Kozloduy NPP goes under planned annual maintenance

Photo: Radio Vidin

The 5th unit of Kozloduy nuclear power plant has been going under a planned annual maintenance and modernization. The unit will be loaded with fresh nuclear fuel during the maintenance campaign. Some measures aimed at extending the life of the 1,000 megawatt reactor will be also fulfilled. Its thermal power is expected to increase with 4% after the annual maintenance. The maintenance of the 5th reactor at Kozloduy NPP will continue until mid June. Currently the 6th nuclear reactor is functioning at its full capacity.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Kulata-Promachonas border crossing between Bulgaria and Greece

30% increase in traffic at Kulata-Promachonas border crossing between Bulgaria and Greece since Schengen entry

One million vehicles have passed through the Greek Promachonas checkpoint on the border with Bulgaria (opposite Kulata) since the beginning of the year, the chairman of the Union of Police Officers of the Greek Prefecture of Serres, Yiannis Kounios,..

published on 6/30/25 5:11 PM
Kiril Petkov

Kiril Petkov leaves parliament, remains a regular member of "We Continue the Change"

Today I am submitting my resignation as a member of the Bulgarian parliament. I am submitting it with peace of mind that I am doing something right, the former co-chair of "We Continue the Change" (PP) Kiril Petkov wrote on Facebook...

published on 6/30/25 3:08 PM

Tender launched for building Sofia Airport Terminal 3

A tender for the design and construction of Terminal 3, pre-terminal space, transport hub and modernization of the existing Terminal 2 at Sofia's Vasil Levski Airport has been launched, the airport operator SOF Connect announced...

published on 6/30/25 1:52 PM