The 5th unit of Kozloduy nuclear power plant has been going under a planned annual maintenance and modernization. The unit will be loaded with fresh nuclear fuel during the maintenance campaign. Some measures aimed at extending the life of the 1,000 megawatt reactor will be also fulfilled. Its thermal power is expected to increase with 4% after the annual maintenance. The maintenance of the 5th reactor at Kozloduy NPP will continue until mid June. Currently the 6th nuclear reactor is functioning at its full capacity.
Bulgarian MPs are discussing a third vote of no confidence in the government of Rosen Zhelyazkov, BTA reports. According to the initiators from Vazrazhdane, the cabinet has failed in its financial policy. “The cabinet is..
With a majority of 197 votes and eight “abstentions”, the MPs accepted the resignation of the former co-chairman of “We Continue the Change” Kiril Petkov as an MP. He took political responsibility for the corruption scandal in..
The authorities in Burgas are introducing a 35-kilometer security zone in the waters of the Burgas Bay, where waiting tankers will not be allowed, BTA reported. The measure is in response to growing public discontent over the strong..
The Sultanate of Oman's Minister of Foreign Affairs, Sayyid Badr bin Hamad Al Busaidi, will visit Bulgaria from 2 to 4 July 2025 at the invitation of his..
The European Commission has announced that the EU will invest nearly €37.5 million in the construction and modernisation of six parking areas with a..
The plenary debate on the third motion of no confidence against Rosen Zhelyazkov's government, proposed by the Revival party, has concluded . According to..
+359 2 9336 661