The 5th unit of Kozloduy nuclear power plant has been going under a planned annual maintenance and modernization. The unit will be loaded with fresh nuclear fuel during the maintenance campaign. Some measures aimed at extending the life of the 1,000 megawatt reactor will be also fulfilled. Its thermal power is expected to increase with 4% after the annual maintenance. The maintenance of the 5th reactor at Kozloduy NPP will continue until mid June. Currently the 6th nuclear reactor is functioning at its full capacity.
‘This is not the time for early elections,’ said Prime Minister Rosen Zhelyazkov at a GERB party conference. According to BTA, he was opposed to holding elections during the country’s planned adoption of the euro in 2026. GERB chairman Boyko..
The Sofia Appellate Court left in custody Varna Mayor Blagomir Kotsev, who is charged with corruption and participation in an organized crime group. The judgment is final. One of the three judges, Andrey Angelov, signed with a dissenting..
Bulgaria’s Minister of Justice Georgi Georgiev conferred in Brussels with the European Commission team responsible for the Resilience and Recovery Plan (RRP) reforms in Bulgaria, reported the Ministry of Justice. EC: RRP payment depends on..
On Saturday, minimum temperatures will range from 8 to 13°C , around 9°C in Sofia. It will be mostly cloudy with rain in many areas. There will be..
+359 2 9336 661