Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Unit 5 of Kozloduy NPP connected to Bulgaria’s energy system

Photo: BGNES

The scheduled testing of Unit 5 of Kozloduy NPP has been completed successfully, confirming the operability of the equipment in the conditions of upgraded power capacity in different modes of operation.

All activities throughout the different stages of the approved testing programme were completed according to schedule, and on 14 July, the unit was connected to the country’s energy grid. The test results will be summarized in a report which will be submitted to the Nuclear Regulatory Agency. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Rosen Zhelyazkov

Parliament rejects GERB-SDS cabinet proposal

After a heated debate, Parliament rejected the proposed GERB-SDS cabinet with Rosen Zhelyazkov as Prime Minister. It was supported by 98 MPs, with 138 voting against and two abstaining. Zhelyazkov, representing the first political force in Parliament,..

published on 7/3/24 4:42 PM

Poll: 63% of Bulgarians say increasing arms supplies to Ukraine is a 'bad idea'

Ukrainian optimism clashes with European scepticism ahead of the NATO summit, with divisions emerging over defence spending and how the war will end. These are the conclusions of a report based on a new survey by the European Council on Foreign..

published on 7/3/24 3:28 PM

People in northern Greece thank Bulgarian fire-fighters for their help

Under the program of the European Civil Protection Mechanism, 240 firefighters from 4 countries arrived in Greece to help their Greek colleagues, the Bulgarian Fire Protection Directorate has reported. Due to the high temperatures..

published on 7/3/24 11:53 AM