The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
Overnight it will be clear. The wind will die down in most areas. After midnight along the Danube River, in lowlands and near rivers fogs will form and visibility will be reduced with low clouds. Minimum temperatures will be between minus 3°C and 2°C,..
The ambassadors of the EU Member States have reached a preliminary agreement on the draft decision to abolish checks at internal land borders for Bulgaria and Romania. This is planned to happen on January 1, 2025. The decision is expected to be finally..
Shopping malls in Sofia and across the country will increase the number of security guards where needed. Additional panic buttons are also to be put in place if retailers wish, the Bulgarian Retail Association said. Groups of suspicious persons will be..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
+359 2 9336 661