The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
On Wednesday, minimum temperatures will range between minus 5° C. and zero, lower in the Northeastern parts of the country where they will drop down to minus 7° C., for Sofia around minus 1° C. During the day the weather will be predominantly cloudy..
The magazine of the Bulgarian news agency BTA called LIK dedicates its February issue to the Bulgarian National Radio. The magazine was presented today in the marble lobby of the BNR building. The BNR marked its 90 th anniversary on 25..
An analysis of the state and preparedness of the armed forces in 2024 was presented during the Chief of Defence Annual Conference in Sofia. In their statements at the event, both President Rumen Radev and Minister of Defence Atanas Zapryanov..
Hristo Stoichkov has been appointed the Sports Tourism Ambassador for the World Tourism Organization (UN Tourism). This became clear at an official..
The common will and economic potential of the two countries are important prerequisites for the upward development of bilateral relations, said President..
Increasing energy connectivity between countries in the region of Southeast Europe will reduce electricity prices, increase competitiveness and security..
+359 2 9336 661