The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
In a letter to Minister of Education Galin Tsokov, the Bulgarian Industrial Capital Association expresses concern over the state plan for admissions for the 2025-2026 academic year, in which the number of vocational classes in schools are being..
The Sofia City Prosecutor’s Office has initiated pre-trial proceedings regarding an organized criminal group for the trafficking of migrants, the prosecutor’s office has announced. Evidence was collected during the investigation regarding 16..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the Ministry of Interior announced on International Day for the Elimination of Violence against Women. A..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana..
After the meeting with his Vietnamese counterpart Luong Cuong in Hanoi, President Rumen Radev emphasized that Bulgaria will continue to support efforts..
As of next year, use of solid fuels for domestic heating in buildings which are part of central heating and gas supply networks will be banned in nine..
+359 2 9336 661