The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
“We find the proposal of Boyko Borissov as premier of Bulgaria absolutely unacceptable, we are not going to be involved in any trading in positions.” This is the answer We Continue the Change/Democratic Bulgaria (PP/DB) gave to the proposal by GERB..
During the night, the weather will be predominantly clear and calm. There will be fog or low clouds before midday in parts of the lowlands, valleys and around water basins. Minimum temperatures minus 4-1° C., for Sofia around minus 2° C. On..
Bulgarian Debora Mihaylova , who was brutally slashed with a mock knife by her boyfriend Georgi Georgiev , is one of the victims of violence mentioned by Ursula von der Leyen in her address on the occasion of the International Day for the Elimination of..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana..
After the meeting with his Vietnamese counterpart Luong Cuong in Hanoi, President Rumen Radev emphasized that Bulgaria will continue to support efforts..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the..
+359 2 9336 661