A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
The International Exhibition of Viticulture and Winemaking "Vinaria" 2025 will once again present the latest trends in wine-making at International Fair Plovdiv. Within the framework of the 32nd edition, from February 18 to 22,..
The latest technological solutions, products and projects in the field of agriculture and agro-industry will be presented at the "Agra 2025" exhibition in the halls of the International Fair in Plovdiv, BTA reports. This year's..
On Tuesday, the lowest temperatures will be between minus 5 and 0°C; in Sofia - around minus 5°C. It will remain cold and cloudy with snowfalls over most of the country and rainfall in the southeastern regions. The snow cover will..
The latest technological solutions, products and projects in the field of agriculture and agro-industry will be presented at the "Agra..
The Vazrazhdane parliamentary party is organizing a protest on February 22 in front of the Bulgarian National Bank against Bulgaria's entry into the..
The agriculture sector in Bulgaria maintains its stability, providing employment to 6% of the population and forming about 4% of the country's GDP. This..
+359 2 9336 661