A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
The National Assembly adopted today, at first and second reading, legislative amendments that expand the powers of the special manager of the Lukoil refinery. The texts were adopted with the votes of the parliamentary majority formations GERB-SDS,..
Sales of starter sets with euro coins with the Bulgarian national side will begin on December 1, 2025 , the BNB announced. They will be in circulation from January 1, 2026. The BNB and Bulgarian Posts will sell starter sets only to individuals;..
Prime Minister Rosen Zhelyazkov will take part in the solemn celebrations on the occasion of the 140th anniversary of the Serbo-Bulgarian War, which will be held on November 7 - Victory Day in the Battle of Slivnitsa. The ceremony..
The Sofia City Court has postponed the extradition case of Igor Grechushkin, the owner of a cargo ship linked to the explosion at the port of Beirut in..
The Road Infrastructure Agency (RIA) has proposed the introduction of temporary restrictions on the movement of heavy trucks weighing over 12 tons along..
November 10 marks 36 years since the symbolic beginning of the transition from a one-party system to democracy in Bulgaria. The day..
+359 2 9336 661