A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
Customs officials have seized a record 120 kg of gold at the Kapitan Andreevo checkpoint on the border with Turkey. Gold bars, coins and jewellery were seized. The driver, a Bulgarian national, was arrested and charged. Another man with Bulgarian and..
Defence Minister Atanas Zapryanov has cancelled the air show at the Graf Ignatievo Air Base after an L-39 ZA military transport plane crashed, the Defence Ministry said. The accident occurred during preparations for tomorrow's demonstrations to..
Bulgaria has always been open to dialogue with North Macedonia and expects that this dialogue will contribute not only to our cultural rapprochement, but also to the strengthening of economic cooperation. We expect that this dialogue will finally..
Overnight, from west to east, the rain showers will stop and the clouds will break up and decrease. Thursday will be sunny in western and central..
The Supreme Administrative Court rejected the appeal of the coalition around Ahmed Dogan - "Democracy, Rights and Freedoms - DPS"..
At a Bulgarian-Chinese business forum in Sofia, President Rumen Radev pointed out the advantages of the business environment in..
+359 2 9336 661